Skip to main content

Managerial and Cost Accounting

Financial accounting reports to outsiders under GAAP. Managerial and cost accounting serves the people inside the business: it measures what products, services, and activities cost so that managers can plan, set prices, and control operations. The BAR section tests whether you can classify costs by behavior, apply the main costing methods, analyze variances from standard, and explain sales results in terms of price, volume, and mix.

The chapter follows that order. It begins with how costs behave, then covers job-order, process, activity-based, absorption, and variable costing, then standard cost variances, cost-volume-profit analysis, and finally the analysis of sales variances.


Cost Classifications​

Before choosing a costing method, you need to know how each cost behaves when activity changes.

Fixed, Variable, and Mixed Costs​

Cost BehaviorDefinitionExample
FixedTotal cost stays the same within the relevant range, whatever the activity levelAnnual building lease of $120,000
VariableTotal cost changes in direct proportion to activityDirect materials at $4 per unit
Mixed (semi-variable)Has both a fixed component and a variable componentUtility bill with a $500 base charge plus $0.08 per machine-hour
Step-fixedFixed over a range of activity, then jumps to a new level once a threshold is crossedOne supervisor per 30 employees; a second is hired at employee 31

The relevant range is the band of activity over which these patterns hold. Outside it, a "fixed" cost such as rent may change because the company needs another building.

Exam Tip

On a per-unit basis the behavior flips. Fixed cost per unit falls as volume rises, because the same total is spread over more units, while variable cost per unit stays constant. Questions often test whether you can tell total behavior from per-unit behavior.

Direct and Indirect Costs​

ClassificationDefinitionExample
Direct costCan be traced to a specific cost object economically and convenientlyWood used in a furniture product line
Indirect costCannot be conveniently traced, so it must be allocatedFactory rent shared by all product lines

Whether a cost is direct or indirect depends on the cost object (the product, department, or activity being costed). A department manager's salary is a direct cost of the department but an indirect cost of each product the department makes.


Separating Mixed Costs: The High-Low Method​

To budget a mixed cost, you need its fixed and variable parts. The high-low method estimates them from two observations: the periods with the highest and lowest activity (not the highest and lowest cost).

Variable Cost per Unit=Cost at High Activity−Cost at Low ActivityHigh Activity−Low Activity\text{Variable Cost per Unit} = \frac{\text{Cost at High Activity} - \text{Cost at Low Activity}}{\text{High Activity} - \text{Low Activity}}

Once the variable rate is known, solve for fixed cost at either point:

Fixed Cost=Total Cost−(Variable Rate×Activity Level)\text{Fixed Cost} = \text{Total Cost} - (\text{Variable Rate} \times \text{Activity Level})

Worked Example: Bear Co. Utilities​

Bear Co. recorded these utility costs over six months:

MonthMachine-HoursUtility Cost
January2,000$2,100
February3,200$2,860
March2,800$2,580
April4,000$3,300
May1,600$1,860
June3,600$3,060

The high point is April (4,000 hours, $3,300) and the low point is May (1,600 hours, $1,860).

Variable Rate=$3,300−$1,8604,000−1,600=$1,4402,400=$0.60 per machine-hour\text{Variable Rate} = \frac{\$3{,}300 - \$1{,}860}{4{,}000 - 1{,}600} = \frac{\$1{,}440}{2{,}400} = \$0.60 \text{ per machine-hour} Fixed Cost=$3,300−($0.60×4,000)=$3,300−$2,400=$900\text{Fixed Cost} = \$3{,}300 - (\$0.60 \times 4{,}000) = \$3{,}300 - \$2{,}400 = \$900

The cost formula is Total Utility Cost = $900 + $0.60 per machine-hour. Using the low point gives the same answer: $1,860 - ($0.60 × 1,600) = $900. To budget a month with 3,000 machine-hours, Bear Co. would expect $900 + $1,800 = $2,700.

The method is quick, but it uses only two data points, so one unusual month can distort the estimate. Regression analysis uses every observation and is more accurate. The exam tests both, with high-low appearing most often in calculations.


Costing Methods​

A costing method answers one question: how do the costs of making something end up attached to the units made? The answer depends on the kind of production.

Job-Order Costing​

Job-order costing tracks costs to individual jobs, batches, or contracts. It fits work where each job is distinct, such as custom furniture, construction projects, or audit engagements.

Direct materials and direct labor are traced to each job. Manufacturing overhead cannot be traced, so it is applied to jobs using a predetermined overhead rate (POHR), set at the start of the year from estimates:

POHR=Estimated Total Manufacturing OverheadEstimated Total Allocation Base\text{POHR} = \frac{\text{Estimated Total Manufacturing Overhead}}{\text{Estimated Total Allocation Base}}

Example: Bear Co. estimates annual overhead of $600,000 and expects to work 40,000 direct labor hours (DLH).

POHR=$600,00040,000 DLH=$15 per DLH\text{POHR} = \frac{\$600{,}000}{40{,}000 \text{ DLH}} = \$15 \text{ per DLH}

If Job 301 uses 120 direct labor hours, applied overhead is $15 × 120 = $1,800.

Debit
Credit
Work-in-Process Inventory
$1,800
Manufacturing Overhead
$1,800

Actual overhead is debited to the same Manufacturing Overhead account as it is incurred. At year-end, a credit balance means overhead was overapplied and a debit balance means it was underapplied. An immaterial difference is closed to Cost of Goods Sold. A material one is prorated among Work in Process, Finished Goods, and Cost of Goods Sold.

Process Costing​

Process costing accumulates costs by department or process instead of by job. It fits continuous mass production of similar units, such as chemicals, beverages, and refined petroleum.

Because some units are only partly finished at the end of a period, costs are spread over equivalent units of production (EUP): the number of whole units that the work done would have completed. Two methods differ in how they treat beginning work in process (WIP):

MethodBeginning WIP TreatmentBest For
Weighted averageBlends beginning WIP costs with current-period costsSimpler calculations; stable costs
FIFOKeeps beginning WIP costs separate from current-period costsMore accurate current-period unit costs

Example: Polar Inc. (Equivalent Units)

Polar Inc.'s Mixing Department reports the following for June:

ItemUnits% Complete (Conversion)
Beginning WIP3,00040%
Started during June18,000N/A
Completed and transferred out17,000100%
Ending WIP4,00025%

Under FIFO, count only the work done in June. The beginning units needed the remaining 60%, then 14,000 units (17,000 - 3,000) were started and completed, and ending WIP is 25% done:

EUPFIFO=(3,000×60%)+14,000+(4,000×25%)=1,800+14,000+1,000=16,800\text{EUP}_{\text{FIFO}} = (3{,}000 \times 60\%) + 14{,}000 + (4{,}000 \times 25\%) = 1{,}800 + 14{,}000 + 1{,}000 = 16{,}800

Under weighted average, count all units completed plus the work in ending WIP, regardless of when the work was done:

EUPWA=17,000+(4,000×25%)=18,000\text{EUP}_{\text{WA}} = 17{,}000 + (4{,}000 \times 25\%) = 18{,}000

The 1,200-unit difference is the work done on beginning WIP last period (3,000 × 40%), which weighted average counts and FIFO does not.

Activity-Based Costing (ABC)​

Traditional costing often spreads overhead using one broad base, such as labor hours. ABC refines this. It assigns overhead to activities (cost pools) and then to products using cost drivers that reflect how much of each activity a product actually consumes.

StepAction
1Identify the major activities (for example, machine setups, quality inspections, material handling)
2Assign overhead costs to each activity cost pool
3Select a cost driver for each pool (for example, number of setups, inspection hours)
4Compute an activity rate for each pool
5Allocate costs to products based on their use of each driver

Example: Grizzly Industries makes two products and has two activity pools:

Activity PoolTotal CostCost DriverTotal Driver Volume
Machine setups$180,000Number of setups600
Quality inspections$90,000Inspection hours1,500
Setup Rate=$180,000600=$300 per setup\text{Setup Rate} = \frac{\$180{,}000}{600} = \$300 \text{ per setup} Inspection Rate=$90,0001,500=$60 per inspection hour\text{Inspection Rate} = \frac{\$90{,}000}{1{,}500} = \$60 \text{ per inspection hour}

If Product A requires 200 setups and 900 inspection hours, its allocated overhead is (200 × $300) + (900 × $60) = $60,000 + $54,000 = $114,000.

ABC usually shifts overhead from high-volume products to low-volume products. A small specialty batch needs as many setups as a large standard batch, so under a volume-based rate the high-volume product was carrying part of the specialty product's cost. Expect questions that compare ABC with a traditional allocation and ask you to explain the difference.

Absorption Costing and Variable Costing​

The two methods differ in one respect: the treatment of fixed manufacturing overhead (FMOH).

FeatureAbsorption CostingVariable Costing
Required by GAAP?YesNo (internal use only)
FMOH treatmentProduct cost (inventoried)Period cost (expensed immediately)
Income statement formatTraditional (COGS-based)Contribution margin format

Under absorption costing, part of each period's fixed overhead sits in ending inventory until the goods are sold. That timing difference explains every gap between the two incomes:

Absorption Income−Variable Income=Change in Inventory (units)×Fixed MOH per unit\text{Absorption Income} - \text{Variable Income} = \text{Change in Inventory (units)} \times \text{Fixed MOH per unit}

When production exceeds sales, inventory grows, fixed costs are deferred, and absorption income is higher. When sales exceed production, previously deferred fixed costs flow into COGS and absorption income is lower. When production equals sales, the two incomes are the same.

Example: Kodiak Partners

Kodiak Partners produces 10,000 units and sells 8,000. Fixed MOH totals $200,000, or $20 per unit.

Absorption Income−Variable Income=(10,000−8,000)×$20=$40,000\text{Absorption Income} - \text{Variable Income} = (10{,}000 - 8{,}000) \times \$20 = \$40{,}000

Absorption income is $40,000 higher because $40,000 of fixed overhead remains in ending inventory instead of being expensed.


Standard Costing and Variance Analysis​

A standard cost is a predetermined cost for one unit of output: how much of each input it should use, and what each input should cost. Comparing actual results with the standard produces variances, which point management to the cost drivers that need attention.

Each input cost splits into a price effect and a quantity effect. In every formula below, a positive result is unfavorable (actual exceeded standard) and a negative result is favorable.

Direct Materials Variances​

Materials Price Variance (MPV)=AQ Purchased×(AP−SP)\text{Materials Price Variance (MPV)} = \text{AQ Purchased} \times (\text{AP} - \text{SP}) Materials Quantity Variance (MQV)=(AQ Used−SQ Allowed)×SP\text{Materials Quantity Variance (MQV)} = (\text{AQ Used} - \text{SQ Allowed}) \times \text{SP}

AQ is the actual quantity, AP the actual price, SP the standard price, and SQ the standard quantity allowed for the actual output. The price variance is usually computed on the quantity purchased, so it is recognized when materials are bought. The quantity variance uses the quantity used.

Example: Panda Industries

Panda Industries' standard is 3 lbs of material per unit at $5 per lb. During the month it produced 2,000 units, purchased 6,500 lbs at $5.20 per lb, and used 6,300 lbs.

  • MPV = 6,500 × ($5.20 - $5.00) = $1,300 Unfavorable
  • SQ Allowed = 2,000 × 3 = 6,000 lbs
  • MQV = (6,300 - 6,000) × $5.00 = $1,500 Unfavorable

Direct Labor Variances​

Labor Rate Variance (LRV)=AH×(AR−SR)\text{Labor Rate Variance (LRV)} = \text{AH} \times (\text{AR} - \text{SR}) Labor Efficiency Variance (LEV)=(AH−SH Allowed)×SR\text{Labor Efficiency Variance (LEV)} = (\text{AH} - \text{SH Allowed}) \times \text{SR}

AH is actual hours, AR the actual rate, SR the standard rate, and SH the standard hours allowed for the actual output.

Example: Panda Industries (continued)

The labor standard is 0.5 hours per unit at $18 per hour. Panda used 1,050 hours at $17.50 per hour to make the 2,000 units.

  • LRV = 1,050 × ($17.50 - $18.00) = -$525, or $525 Favorable
  • SH Allowed = 2,000 × 0.5 = 1,000 hours
  • LEV = (1,050 - 1,000) × $18.00 = $900 Unfavorable

The two labor variances may be linked. Panda may have used less-experienced workers at a lower rate, who then took longer to do the work.

Overhead Variances​

Overhead is applied to production at standard: standard hours allowed times the overhead rate. The difference between actual overhead and applied overhead can be broken into three pieces (three-way analysis) or two (two-way analysis).

VarianceFormula
SpendingActual OH - (Budgeted Fixed OH + Variable OH Rate × Actual Hours)
Efficiency(Actual Hours - Standard Hours Allowed) × Variable OH Rate
Volume(Denominator Hours - Standard Hours Allowed) × Fixed OH Rate

The two-way analysis combines spending and efficiency into a single budget (controllable) variance and keeps the same volume variance.

The volume variance relates only to fixed overhead. The fixed rate was set by dividing budgeted fixed overhead by a denominator level of activity. If the standard hours allowed for actual output fall short of that level, less fixed overhead is applied than was budgeted, and the volume variance is unfavorable. It reflects how fully capacity was used, not how well spending was controlled.

Example: Kodiak Inc.

Kodiak Inc. sets its overhead rates using a denominator of 5,000 machine-hours per month. Budgeted fixed overhead is $50,000 and the variable overhead rate is $6 per machine-hour. In March, Kodiak worked 4,800 actual hours, the standard hours allowed for its output were 4,600, and actual overhead was $82,000.

  • Fixed OH Rate = $50,000 ÷ 5,000 = $10 per hour
  • Spending = $82,000 - ($50,000 + $6 × 4,800) = $82,000 - $78,800 = $3,200 Unfavorable
  • Efficiency = (4,800 - 4,600) × $6 = $1,200 Unfavorable
  • Volume = (5,000 - 4,600) × $10 = $4,000 Unfavorable

As a check, applied overhead is 4,600 × ($6 + $10) = $73,600. Actual overhead of $82,000 exceeds it by $8,400, which equals the three variances added together ($3,200 + $1,200 + $4,000). In a two-way analysis, the budget variance is $4,400 unfavorable and the volume variance is $4,000 unfavorable.


Cost-Volume-Profit (CVP) Analysis​

CVP analysis asks how operating income changes when volume, price, or costs change. It rests on the contribution margin (CM): what remains of each sales dollar after variable costs, available first to cover fixed costs and then to provide profit.

CM per Unit=Selling Price−Variable Cost per UnitCM Ratio=CM per UnitSelling Price\text{CM per Unit} = \text{Selling Price} - \text{Variable Cost per Unit} \qquad \text{CM Ratio} = \frac{\text{CM per Unit}}{\text{Selling Price}}

The breakeven point is the volume at which CM exactly covers fixed costs. Adding a target profit to the numerator gives the volume needed to earn it. The margin of safety measures how far sales could fall before the company reaches breakeven.

Breakeven (units)=Total Fixed CostsCM per UnitBreakeven (dollars)=Total Fixed CostsCM Ratio\text{Breakeven (units)} = \frac{\text{Total Fixed Costs}}{\text{CM per Unit}} \qquad \text{Breakeven (dollars)} = \frac{\text{Total Fixed Costs}}{\text{CM Ratio}} Units for Target Profit=Fixed Costs+Target ProfitCM per Unit\text{Units for Target Profit} = \frac{\text{Fixed Costs} + \text{Target Profit}}{\text{CM per Unit}} Margin of Safety=Budgeted (or Actual) Sales−Breakeven SalesMargin of Safety %=Margin of SafetyBudgeted (or Actual) Sales\text{Margin of Safety} = \text{Budgeted (or Actual) Sales} - \text{Breakeven Sales} \qquad \text{Margin of Safety \%} = \frac{\text{Margin of Safety}}{\text{Budgeted (or Actual) Sales}}

Worked Example: Polar Inc.​

Polar Inc. sells its product for $50 per unit. Variable cost is $30 per unit, and total fixed costs are $160,000.

  • CM per unit = $50 - $30 = $20, and the CM ratio = $20 ÷ $50 = 40%
  • Breakeven = $160,000 ÷ $20 = 8,000 units, or $160,000 ÷ 0.40 = $400,000 of sales
  • A target profit of $60,000 requires ($160,000 + $60,000) ÷ $20 = 11,000 units
  • If budgeted sales are 10,000 units ($500,000), the margin of safety is $500,000 - $400,000 = $100,000, or 20% of sales

These results hold only under CVP's assumptions: costs are linear and can be split cleanly into fixed and variable, the selling price does not change with volume, and for a company with several products, the sales mix stays constant. When a question changes one of those facts, the breakeven point changes too.


Sales Analysis: Price, Volume, and Mix Variances​

When actual results differ from the budget, management wants to know why. Sales variances split the difference into three drivers: the prices charged, the number of units sold, and the mix of products sold.

The sales price variance isolates the effect of charging a different price:

Sales Price Variance=(Actual Price−Budgeted Price)×Actual Quantity Sold\text{Sales Price Variance} = (\text{Actual Price} - \text{Budgeted Price}) \times \text{Actual Quantity Sold}

The sales volume variance isolates the effect of selling a different number of units. It is usually measured in budgeted contribution margin, so that it shows the effect on profit:

Sales Volume Variance=(Actual Quantity−Budgeted Quantity)×Budgeted CM per Unit\text{Sales Volume Variance} = (\text{Actual Quantity} - \text{Budgeted Quantity}) \times \text{Budgeted CM per Unit}

For a company with several products, the volume variance splits into two parts. The sales mix variance captures selling a different proportion of products than planned. The sales quantity variance captures selling more or fewer units in total at the budgeted mix.

Sales Mix Variance=(Actual Mix %−Budgeted Mix %)×Total Actual Units×Budgeted CM per Unit\text{Sales Mix Variance} = (\text{Actual Mix \%} - \text{Budgeted Mix \%}) \times \text{Total Actual Units} \times \text{Budgeted CM per Unit} Sales Quantity Variance=(Total Actual Units−Total Budgeted Units)×Budgeted Mix %×Budgeted CM per Unit\text{Sales Quantity Variance} = (\text{Total Actual Units} - \text{Total Budgeted Units}) \times \text{Budgeted Mix \%} \times \text{Budgeted CM per Unit}

In all of these, a positive result is favorable. Some questions measure the volume variance in revenue terms, multiplying by the budgeted price instead of the budgeted CM. Read the requirement to see which one is asked for.

Worked Example: Bear Co. Multi-Product Sales​

Bear Co. sells two products. Actual variable cost per unit equaled budget.

ProductBudgeted UnitsBudgeted PriceBudgeted CM/UnitActual UnitsActual Price
Alpha6,000$40$165,500$42
Beta4,000$60$305,500$58
Total10,00011,000

The budgeted mix was 60% Alpha and 40% Beta. The actual mix was 50% of each.

VarianceAlphaBetaTotal
Price: (AP - BP) × actual units($42 - $40) × 5,500 = $11,000 F($58 - $60) × 5,500 = $11,000 U$0
Mix: (actual % - budget %) × 11,000 × budgeted CM(50% - 60%) × 11,000 × $16 = $17,600 U(50% - 40%) × 11,000 × $30 = $33,000 F$15,400 F
Quantity: (11,000 - 10,000) × budget % × budgeted CM1,000 × 60% × $16 = $9,600 F1,000 × 40% × $30 = $12,000 F$21,600 F
Volume (mix + quantity): (actual - budgeted units) × budgeted CM(5,500 - 6,000) × $16 = $8,000 U(5,500 - 4,000) × $30 = $45,000 F$37,000 F

To check the result, budgeted CM was (6,000 × $16) + (4,000 × $30) = $216,000. Actual CM was 5,500 × ($42 - $24) + 5,500 × ($58 - $30) = $99,000 + $154,000 = $253,000, where $24 and $30 are the budgeted variable costs. The $37,000 increase equals the price variance ($0) plus the volume variance ($37,000).

The story is now clear. The price changes canceled out. Bear Co. sold 1,000 more units than planned, worth $21,600, and it shifted its sales toward Beta, the product with the higher margin, worth another $15,400.

Exam Tip

A favorable mix variance means the mix shifted toward products with higher contribution margins per unit, not higher prices. That is why mix variances are computed with budgeted CM per unit.


Summary of Key Formulas​

FormulaEquation
High-low variable rate(High cost - Low cost) ÷ (High activity - Low activity)
POHREstimated total MOH ÷ Estimated total allocation base
Absorption vs. variable incomeChange in inventory units × Fixed MOH per unit
Materials price varianceAQ purchased × (AP - SP)
Materials quantity variance(AQ used - SQ allowed) × SP
Labor rate varianceAH × (AR - SR)
Labor efficiency variance(AH - SH allowed) × SR
Overhead spending varianceActual OH - (Budgeted fixed OH + Variable OH rate × AH)
Overhead efficiency variance(AH - SH allowed) × Variable OH rate
Overhead volume variance(Denominator hours - SH allowed) × Fixed OH rate
Breakeven (units)Fixed costs ÷ CM per unit
Breakeven (dollars)Fixed costs ÷ CM ratio
Margin of safetyBudgeted (or actual) sales - Breakeven sales
Sales price variance(Actual price - Budgeted price) × Actual quantity
Sales volume variance(Actual quantity - Budgeted quantity) × Budgeted CM per unit
Sales mix variance(Actual mix % - Budgeted mix %) × Total actual units × Budgeted CM per unit
Sales quantity variance(Total actual units - Total budgeted units) × Budgeted mix % × Budgeted CM per unit